Totally self centered post follows:
I am the Technical Director for a large church. My main emphasis is on video, MATV and lighting. This weekend we're having an evangelistic youth event called, DNOW (Discipleship Now). My "show time" duties are running the graphics and the live internet streaming. So here I'm hard at work, along with our video director.
I'm running a graphics computer, a live streaming computer, and Anna and I share side screen switching duties on a switcher between us. She "calls" the show and the camera shots and runs the camera switcher. About where the photographer is standing is another computer (run by our your music director) which is responsible for the words to the songs and the side graphics. There are about 100 graphics (not including the "words") and 20 videos. I also provide the background music feed.

Here's a picture in the dark from behind my position so you can see the switchers and the main screen. We're located in the corner of the track looking down on the stage and audience. There are about 12s screen in "video world" and another 4 in the lighting and sound positions down on the floor.

Compared to "big" shows this is small time, but still pretty big for us.
If you want to watch some of the show, I'm streaming live (nothing fancy, just camera shots) at
livestream.com/mtbethelumc 10:30am - 11:30 today, 7:30pm - 10:00pm tonight and 11am - 12noon Sunday (ET)
It's cutting into range time this week, but it means time off next couple of weeks and I expect about 8 hours at the range coming up. (note to self: order more bullets)